Gas
10 MMSCFD, SG 0.65
Design basis
Oil
2,000 bbl/d, SG 0.82
Design basis
Water
1,500 bbl/d, SG 1.05
Design basis
Separator
12 barg, 60 °C
Design basis

The process, in order

Tap any item to go to its stage.

  • CheckedThe basis records it as checked, confirmed or decided.
  • ProposedTo be confirmed in a later lesson.
  • Design basisA plant input the design starts from.
  • To confirmA default or upper bound, still to be confirmed.

Stage 1 of 10 · WH-101

Well and wellhead

Labelled wellhead and Christmas tree on well WH-101: casing head, casing spool, tubing head, master valves, flow cross, wing valves, swab valve and tree cap.
Wellhead and Christmas tree on WH-101, labelled. Tap the picture for full size.
Parts labelled in this picture
  • Tree cap and gauge
  • Swab valve
  • Flow cross
  • Production wing valve
  • Kill wing valve
  • Upper master valve (SSV)
  • Lower master valve
  • Tubing head adapter
  • Tubing head (C section)
  • Casing spool (B section)
  • Casing head (A section)
  • Hydraulic control panel
  • Check valve
  • Pressure transmitter

The well brings oil, gas and water up from the reservoir through the tubing. Casing and cement hold back the rock and keep each fluid in its own path.

The wellhead carries the casing and tubing. The Christmas tree on top holds the valves that open, close and kill the well.

There is no choke on this tree. The plant choke is HV-134, at the heater H-100.

The well section is illustrative and not to scale.

Well and wellhead design data
ItemValueStatus
Shut-in pressure35 bargTo confirm
Well fluid to the plant30,818 kg/hChecked
Arriving at the manifold30 barg, 30 °CChecked

Casing, tubing and tree sizes are not in the plant basis, so no size is shown here.

Labelled section of the well from the reservoir to the tree: conductor, surface, intermediate and production casing, cement, tubing, packer, safety valve and perforations. Not to scale.
Well section, labelled. Not to scale. Tap the picture for full size.

What you learn

  • Follow the well from reservoir to tree and select API 6A equipment.
Live15 of 18 lessons live

Process Design

India Rs 6,399 · Outside India $103

Next step, free: Lesson 1 · Oil & Gas Process Design: Full Worked Example

Stage 2 of 10 · MF-100

Manifold

The production manifold on its skid: a header with block valves, between the wellhead and the heater.
Production manifold, between the well and H-100.

The production manifold gathers the well flow into one header before the heater. Its valves let an operator route or isolate the flow.

When the well is shut in, pressure here climbs to the shut-in value, so this part of the plant is designed for it.

Manifold design data
ItemValueStatus
Shut-in pressure35 bargTo confirm
Flow to H-100 coil 130,818 kg/hChecked
Flowing conditions30 barg, 30 °CChecked

The basis does not set the size of the line from the manifold to H-100 yet.

What you learn

  • How well flow is gathered before the heater.

Stage 3 of 10 · H-100 · HV-134

Heater

The indirect water-bath heater H-100, a horizontal shell with an exhaust stack, on saddles.
H-100 indirect water-bath heater.

When well fluid drops in pressure across a choke it cools, and cold wet gas can form hydrates that block the line.

So H-100 warms the fluid in coil pass 1, the choke HV-134 cuts the pressure, and coil pass 2 brings it up to separator temperature.

The coils sit in a hot water bath, so the flame never touches the process fluid.

Heater design data
ItemValueStatus
Inlet / outlet temperature30 / 60 °CChecked
Pressure before / after HV-13430 / 12.5 bargChecked
After coil 1 / after choke45 / 41.9 °CChecked
Duty, normal894 kWProposed
Duty, design (coldest arrival, max flow)1,681 kWProposed
Fired duty at assumed efficiency1,192 kW at 0.75Proposed
Fuel gas, normal118 Sm³/hProposed
Water bath80 °C, 12 m³Proposed

What you learn

  • Why chokes freeze, and where the heater must put its heat.

Stage 4 of 10 · V-100

Separator

The horizontal three-phase separator V-100 on saddles, with its access platform, stair and relief valve.
V-100 inlet three-phase separator.

V-100 is a horizontal three-phase separator. It gives the mixed stream the time and space to settle.

Gas leaves from the top. Oil and water settle into layers and leave through their own outlets, each on its own level control.

From here on, the plant handles gas, oil and water separately.

Separator design data
ItemValueStatus
Size1,800 mm ID x 6,000 mm T/TChecked
Design pressure, vacuum, temperature15 barg, FV, 120 °CChecked
MAWP16.74 bargChecked
Hydrotest21.76 bargChecked
MDMT-29 °CChecked
MaterialSA-516 Gr 70Checked
Corrosion allowance3 mmChecked
Shell / head plate16 / 16 mmChecked
Operating pressure, temperature12 barg, 60 °CDesign basis
Gas / oil / water out9,520 / 10,864 / 10,434 kg/hChecked

What you learn

  • Design a horizontal vessel to ASME VIII Div. 1: shell, heads, nozzles and saddles.
  • Compare separator inlet devices and droplet separation with CFD.

Stage 5 of 10 · V-110 · K-100 · E-101 · E-100

Gas compression

The suction scrubber V-110 in the foreground, with the two-stage reciprocating compressor K-100 on its skid and the air cooler structure behind.
V-110 suction scrubber in front, K-100 compressor skid behind.

Gas leaves the separator at too low a pressure for export, so K-100 raises it in two stages.

V-110 catches liquid first, because a reciprocating compressor cannot take liquid. E-101 cools the gas between the stages, and E-100 cools it after the second.

One stage would pass the discharge temperature limit. Two stages with an intercooler stay under it.

Gas compression design data
ItemValueStatus
Suction12 barg, 60 °CProposed
Interstage / discharge pressure27.6 / 62 bargProposed
Ratio per stage / overall2.201 / 4.842Proposed
Discharge temperature, stage 1 / 2131.5 / 119.4 °CProposed
If it were one stage216.2 °CProposed
Discharge limit used150 °CProposed
E-101 / E-100 outlet50 / 90 °CProposed
Assumed k / adiabatic efficiency1.27 / 0.85Proposed
Gas to K-100 suction9,426 kg/hChecked

The basis gives no vessel size for V-110 yet.

What you learn

  • Why a scrubber protects each compressor stage.
  • Set stage count and discharge temperature for a two-stage compressor.
  • Why gas is cooled between compressor stages.
  • Cool the compressed gas before the export scrubber.
Live15 of 18 lessons live

Process Design

India Rs 6,399 · Outside India $103

Coming Lesson 10 · Gas Compressor and Scrubber Design

Stage 6 of 10 · V-200

Export scrubber

The vertical export gas scrubber V-200 on its skirt, with the gas line leaving from the top.
V-200 export gas scrubber, vertical on a skirt.

Cooling the compressed gas can drop liquid out of it. V-200 catches that liquid so it does not travel into the export line.

It is a vertical vessel on a skirt, and it runs at the highest pressure in the plant.

Export scrubber design data
ItemValueStatus
Inlet temperature, after E-10090 °CProposed
Operating pressure62 bargProposed
Design pressure70 bargProposed
PSV-125 set pressure70 bargProposed

What you learn

  • Follow a vertical scrubber through flanges, cone, skirt and lifting lugs.

Stage 7 of 10 · T-100 · P-101

Oil storage and pump

The oil storage tank T-100 with its stair and roof platform, and the export pump P-101 on its base in the distance.
T-100 oil tank, with P-101 on its base to the left.

V-100 pressure pushes the oil through LV-101 into the atmospheric tank T-100, so that leg needs no pump.

In the tank the lightest ends flash off as gas. The export pump P-101 then takes the stabilised oil from the tank outlet and sends it to export.

Oil storage and pump design data
ItemValueStatus
Oil into T-10010,864 kg/h, 0 barg, 60 °CChecked
Flash gas from the tank (upper bound)130 kg/h, 111 Sm³/hTo confirm
Stabilised oil to P-10110,734 kg/hChecked
P-101 discharge10 bargProposed
P-101 shut-off12 bargProposed

The basis does not set the T-100 size or the export pipeline data yet.

What you learn

  • Size a storage tank for the process and see why venting matters.
  • Work out head, flow and NPSH available at the lowest level.
Live15 of 18 lessons live

Process Design

India Rs 6,399 · Outside India $103

Coming Lesson 9 · Storage Tank Design: Venting and Size

Coming Lesson 8 · Pump Sizing and NPSH: Worked Example

Stage 8 of 10 · PSV-100 · V-400 · FS-100

Relief and flare

Looking up from the flare knock-out drum V-400 to the guyed flare stack FS-100 behind it.
V-400 knock-out drum, with the FS-100 flare stack behind.

If pressure climbs, the control valve PV-100B sends gas to flare first. If it keeps climbing, PSV-100 opens to protect V-100.

Relief gas passes through the knock-out drum V-400, which catches liquid, and burns at the tip of the flare stack FS-100.

Relief and flare design data
ItemValueStatus
PV-100B set point13 bargProposed
PSV-100 set pressure15 bargTo confirm
PSV-100 orifice3L4To confirm
PSV-100 rated flow20,488 kg/hTo confirm
PSV-100 inlet line, loss4", 2.12 %To confirm
PSV-123 / PSV-125 set31 / 70 bargProposed

The basis does not set V-400 or FS-100 sizes yet. The flare distance in the picture is illustrative.

What you learn

  • Size a relief valve to API 520 and 521, including the fire case.
  • Work through the depressuring target, flare header and knock-out drum.
  • Blowdown and flare design, from depressuring target to flare header.
Live15 of 18 lessons live

Process Design

India Rs 6,399 · Outside India $103

Coming Lesson 15 · Blowdown and Flare Design

Stage 9 of 10 · Rack · 6"-P-1001 · SDV-100

Pipe rack and piping

The steel pipe rack running through the plant, carrying lines between the process units.
The pipe rack, looking along its length.

The pipe rack carries the lines between units in one place, where they can be supported and reached.

The inlet line 6"-P-1001 shows why pipe class matters. It sits upstream of SDV-100, and the choke restricts but does not isolate, so on shut-in this line can see the full shut-in pressure.

SDV-100 is the spec break between the higher and lower pressure class.

Pipe rack and piping design data
ItemValueStatus
6"-P-1001 design35 barg, 180 °CTo confirm
6"-P-1001 class300#To confirm
6"-P-1001 line hydrotest52.5 bargTo confirm
Spec break at SDV-100300# | 150#To confirm
Line into V-10012"-P-1102 (A1A 150#)To confirm
Actual flow in the inlet line1,034 m³/h, 12.5 barg, 60 °CChecked

What you learn

  • Pipe size, schedule, fittings, flanges and valves, worked on real plant lines.
  • Check a line against the API RP 14E erosional velocity limit.

Stage 10 of 10 · LT · TIC · SDV

Instruments and control

A control valve with its actuator and positioner on the V-100 liquid outlet line, under the vessel.
Control valve on a V-100 liquid outlet.

Instruments measure level, pressure and temperature, and control valves act on those signals.

On V-100 the oil level sits between alarm and trip points, so an operator has time to react before the plant trips.

TIC-131 holds the heater outlet temperature, and temperature alarms and trips protect K-100.

Instruments and control design data
ItemValueStatus
V-100 oil level, LAHH1,050 mmChecked
LAH915 mmChecked
NLL845 mmChecked
LAL775 mmChecked
LALL635 mmChecked
Time, LAH to LAHH2.03 minChecked
Time, LAL to LALL2.06 minChecked
K-100 discharge TAH / TAHH140 / 150 °CProposed

What you learn

  • Choose DP, displacer or guided-wave radar and set alarm and trip levels.
  • Read shutdown valves, interlocks and cause and effect on a P&ID.

Bundle · 6 courses, 39 lessons live

Process Bundle

Process Design, HYSYS, How to Read P&ID, Process Foundations, Line Sizing, PSV Design.

India
Rs 9,999
Outside India
$159
Bought separately (Foundations is free)
Rs 13,195 / $215
See Process Bundle

See the whole plant

Rotate the plant in 3D